You are here
Metacrylics® Application over Torchdown BRAI® (Ungranulated) Roofing: 15-Year Materials Warranty
Printer-friendly version|
Materials Needed |
|---|
|
EPDM Rinse @ 0.2 gal/100 ft² |
0.2 x _____ SQs = _____ Gallons |
|
Clear Acrylic BASE (self-priming) @ 2 gal/100 ft² |
2 x _____ SQs = _____ Gallons |
|
Stitchbond Polyester Fabric @ 1 SQ/100 ft² |
1 x _____ SQs = _____ Squares |
|
Acrylic WHITE @ 5 gal/100 ft² |
5 x _____ SQs = _____ Gallons |
|
Acrylic GEL and Stitchbond Fabric |
As Needed |
-
Thoroughly clean roof, removing any debris prior to application of EPDM Rinse.
-
Apply Metacrylics® EPDM Rinse over the TORCHDOWN BRAI @ .2 gal/SQ; wait 20 minutes, then pressure wash roof to remove EPDM Rinse.
-
Thoroughly pressure wash roof again with a minimum of 3,000 PSI
-
3-COURSE PENETRATION DETAIL (see Metacrylics® Penetration Detail instructions sheet which includes all penetrations, drains, scuppers, flashings, ductworks, & parapets).
-
Apply to entire roof 2 gal/SQ Clear Acrylic BASE (self-priming), embed stitchbond polyester fabric using a brush or broom. Allow 24 hours curing time.
-
Apply 2 gal/SQ of Metacrylics® Acrylic WHITE (or Acrylic BASE) over the Stitchbond Polyester Fabric and allow 24-48 hours curing time.
-
Apply 3 gal/100 ft² Metacrylics® Acrylic WHITE in two applications of @ 1.5 gal/SQ each application. Allow 24-48 hours curing time between applications.